Black Mountain Drilling Results
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
2 February 2024
Black Mountain Drilling Results: First significant lithium
intersections in Wyoming; and Base Metals (Cu, Zn and Pb)
potential identified
HIGHLIGHTS:
•
Black Mountain maiden drill program delivers strong initial hard rock lithium results
with multiple mineralised lithium intersections from first three (3) holes
•
First three (3) holes all intersected high-grade spodumene mineralisation confirming
the potential of the Black Mountain LCT pegmatite swarms
•
•
Notable results from first three (3) holes include:
o
BMDDH23_01 15.48m @ 1.12% Li2O and 79ppm Ta2O5 from 2.74m, including 4.27m
o
BMDDH23_02 14.33m @ 0.84% Li2O and 61ppm Ta2O5 from 1.83m, including 2.29m
o
BMDDH23_03 18.81m @ 0.85% Li2O and 98ppm Ta2O5 from 45.26m, including
@ 2.46% Li2O and 128 ppm Ta2O5 from 9.94m
@ 3.09% Li2O and 138ppm Ta2O5 from 10.67m
5.79m @ 1.08% Li2O and 105ppm Ta2O5 from 47.55m
High-grade potential with individual grades downhole of up to 3.79% Li2O and 230ppm
Ta2O5
•
Drilling continues with eight (8) holes having been completed to date, assay results for
the subsequent five (5) holes are pending and expected to be announced by April 2024
•
BDDDH23_01 intersected a zone of stockwork vein and disseminated pyrite-pyrrhotite
mineralisation over an interval of approximately 100m within the biotite schist
•
The Company is optimistic it may have intersected the peripheral portion of a
potentially larger base metal mineral system, with selected intervals grading up to 0.6%
(6,012ppm) Cu, 1.0% (9,931ppm) Zn and 15.4% (154,412ppm) Pb
•
The Company plans to extend the soil sampling program and run preliminary IP lines
over the base metals anomaly in Q3 2024
Chariot Corporation Limited (“Chariot” or the “Company”) is pleased to advise that it has intersected
significant zones of strong lithium-tantalum mineralisation in the first three (3) holes (“First Three
Holes”) of the maiden drill program at the Black Mountain Project (“Black Mountain”), in Wyoming,
U.S.A.
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
1
These drill results confirm the potential of the Black Mountain lithium caesium tantalum (“LCT”)
pegmatite swarms with the assays returning individual lithium and tantalum values of up to 3.79%
Li2O (BMDDH23_01-0021) and 230ppm Ta2O5 (BMDDH23_01-0033).
This is the first hard rock lithium discovery, through drilling, in Wyoming, U.S.A.
Wyoming Lithium Pty Ltd (“WLPL”) and Panther Lithium Corporation (“PLC”) co-founder 1, Dr Edward
Max Baker 2 commented:
“We’ve got stunning initial results in the midst of the North American winter. The targeted hard rock lithium
system has been intersected in multiple holes, but we need to come back in the North American summer for
a 5,000 – 10,000m drill program to get a better handle of the resource potential. The base-metals sulfide
mineralisation is also very promising and indicates the potential for base metals and/or gold mineralisation,
separate from the lithium mineralisation.”
First Three Holes: Drill Results
The First Three Holes (being drill holes BMDDH23_01 to BMDDH23_03) have been completed and
assayed with the results summarised in Table 1 (see also Figure 1). A total of eight (8) holes have been
drilled to date. The assay results for the subsequent five (5) drill holes are pending and expected to
be announced by the end of April 2024.
The drill intercepts reported from the First Three Holes confirm the lithium potential of the Black
Mountain LCT pegmatites (see Table 1), as indicated by the surface rock chip sampling results which
were disclosed in the Company’s initial public offering prospectus and the Company’s announcement
dated 9 November 2023.
Drill Hole
From (m)
To (m)
Interval (m)
Li2O%
Ta2O5 ppm
BMDDH23_01
2.74
18.23
15.48 (14*)
1.12
78.8
including
4.15
5.49
1.34
1.91
68.0
and
9.94
14.2
4.27
2.46
128.4
BMDDH23_02
1.83
16.15
14.33 (13*)
0.84
61.3
including
10.67
12.95
2.29
3.09
137.7
Includes 2.29m of core loss between
45.26m and 47.55m
45.26
62.73
18.81 (8*)
0.85
98.4
including
47.55
53.34
5.79
1.08
104.9
BMDDH23_03
Table 1: Assay results from the first three drill holes at Black Mountain. Intervals reported are downhole/apparent
widths which are greater than true widths. * Denotes estimated true width.
Chariot holds a 93.9% interest in WLPL. PLC is a wholly owned subsidiary of WLPL.
Dr Baker holds 7,926,860 ordinary shares in Chariot (equal to a 5.3% interest in the undiluted shares on issue of Chariot). Dr
Baker is also engaged as a consultant by Chariot.
1
2
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
2
The visual inspection of the drill cores indicates that the high-grade lithium values are from intervals
containing spodumene mineralisation, with no other lithium bearing mineral phases being visually
identified to date.
Northwest Area
Southeast Area
Figure 1: Plan View of the Black Mountain Project, showing the pegmatite outcrops (dark red) and interpreted folded
geometry (in light red) along with the Northwest and Southeast Cross-Section Lines and Drill Collars. The rock chip
and soil geochemistry results are also shown. Refer to the Prospectus for the complete set of rock chip assay results 1.
BMDDH23_01 and BMDDH23_02 were drilled from Pad 1 in the central Northwest swarm area
(“Northwest Area”). BMDDH-23-01 hole was drilled to a depth of 177m at an azimuth of 260 degrees
and a dip of -50 degrees (see Figure 2, Figure 3 and Figure 4 for selected photos of Drill Core).
BMDDH23_02 hole was drilled to a total depth of 42m with the same azimuth BMDDH-23-01, but with
a dip of -65 degrees (see Figure 1).
BMDDH23_01 and BMDDH23_02 both intersected the same pegmatite (see Figure 5).
1
The Prospectus can be downloaded from the Company website: www.chariotcorporation.com
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
3
Figure 2: Pegmatite intersection in BMDDH23_01 from 10.5m (34.5ft.) to 13.7m (45ft.) showing some of the spodumene
mineralisation.
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
4
Figure 3: Drill Core sample from BMDDH23_01 – from 10.6m
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
5
Figure 4: Pegmatite intersection in BMDDH23_02 from 9.6m (31.5ft.) to 14.5m (47.5ft.).
The BMDDH23_01 and BMDDH23_02 Drill Cores indicate that the Northwest Area comprise steeply
dipping limbs of a tightly folded package of dikes, where the fold is now interpreted to be more open
than initial anticipated before drilling, whereby the dikes to the west of drill pad 1 are expected to dip
westward at a dip approximately parallel to BMDDH23_01 (See Figure 5).
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
6
Figure 5: A – AA cross section (see Figure 1) through the Northwest Area showing BMDDH23_01 and BMDDH23__02 drill
traces with the intersected pegmatite shown in red.
BMDDH23_03 was drilled in the central southeast swarm area (the “Southeast Area”) with an azimuth
of 160° and dip of 50° to a depth of 78m. The pegmatite dike swarms in the Southeast Area comprise
a complex fold-hinge, which based on the location of the intercept of pegmatite in BMDDH23_03 (see
Figure 6) appears to dip moderately steeply to the southeast (see Figure 7).
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
7
46.0m
47.5m
49.1m
50.9m
55.3m
56.3m
52.4m
50.0m
53.9m
55.3m
61.4m
63.4m
53.9m
Figure 6: Pegmatite intersection in BMDDH23_03 from 45.3m (161ft.) to 63.4m (208ft.).
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
8
Figure 7: B-BB cross section through the SouthEast Area showing BMDDH23_03 drill trace with the intersected
pegmatite shown in red.
Independent Technical Guidance and Review of Exploration Results
ERM Australia Consultants Pty Ltd (previously CSA Global), ERM Sustainable Mining Services (“CSA
Global”), have provided technical guidance for the development of the Black Mountain exploration
plan and completed an independent review of the data, geological interpretations and exploration
results pertaining to this announcement. CSA Global are satisfied these scientific and technical
disclosures were appropriate to support the reporting of these Exploration Results.
Phase 1 Drill Program
The Phase 1 maiden drilling program (“Phase 1 Drill Program”) consisting of 10-15 holes was designed
to test under outcropping pegmatite dikes swarms with anomalous Li rock chip values to determine
the geometry of the dikes and to confirm the hard rock lithium potential ahead of a comprehensive
resource drill-out in Q3 2024.
Major Drilling Group International Inc. (“Major Drilling”) has been contracted to drill oriented triple
tube HQ sized diamond drill core (“Drill Core”) using a Boart Longyear LF90 Surface Diamond Core
Drill Rig (the “Drill Rig”) (see Figure 8). Drill Core from Black Mountain is transported to Chariot’s core
handling and storage facility in Jeffrey City, Wyoming, where each Drill Core is photographed, logged,
and measured for density and recovery (see Figure 9). Drill Core samples are being assayed by
American Assay Labs in Reno, Nevada.
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
9
Figure 8: Drill Rig at Black Mountain.
Figure 9: Chariot Senior Project Geologist, Willis Blakeslee, inspecting Drill Core.
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
10
Exploration permitting in Wyoming on federal land is a two-step process. Approval from United States
Bureau of Land Management in Wyoming (“BLM”) is required. At ‘Notice’ of Intent (“NOI”) levels of
exploration (a basic level), a maximum disturbance of only five (5) acres is allowed and, if disturbance
is likely to exceed this level, a more thorough Exploration Plan of Operations (“EPO”) must be
submitted. An EPO, which typically requires biological and cultural/archaeological studies, can take 612 months to complete, although there is then no restriction on the size of the disturbance.
The Phase 1 Program was limited to the currently permitted seven (7) drill pads due to the 5-acre limit
on disturbance under the NOI, which applies to both access roads and the drill pads.
Chariot plans to apply for an EPO to increase the area of disturbance from 5-acres under the NOI to
up to 2,500 acres for the Phase 2 Resource Drill Program commencing in Q3 2024.
The Phase 1 Drill Program was limited to testing the two central pegmatite swarms (of the four
pegmatite swarms identified at Black Mountain), being the Northwest Area and the Southeast Area.
Base Metal Mineralisation Identified in the First Drill Hole (BMDDH23_01)
The upper section of BMDDH23_01 intersected pyrite-pyrrhotite mineralisation, occurring as veinlets
and dissemination within the biotite schist over an interval of approximately 100m. At this early stage,
only several select intervals of this mineralisation were sampled and assayed (see Table 2).
Based on the location of this drill hole relative to an 800m long by 150m wide zone of anomalous zincin-soils, the Company is optimistic that it has intersected the peripheral portion of a potentially larger
base metal mineral system (see Figure 10). The zinc and lead anomalies are situated on the contact
between metabasalt to the south and metasediments to the north coincident with a two-meter-wide
zone of black massive chert outcrops along the southern margin of the soil anomaly. Based on the
anomalous drill intercepts, the geological setting and the extent of the zinc and lead soil anomaly, the
Company plans to further investigate this base metal mineralisation by extending the soil sampling
program and conducting a preliminary induced polarisation survey (“IP”) lines across the anomaly in
Q3 2024.
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
11
Hole ID
From
(m)
To
(m)
Interval
(m)
Cu
(ppm)
Pb
(ppm)
S
(ppm)
Zn
(ppm)
BMDDH23_01
23.4
23.8
0.3
6,012
0
150,328
1,294
BMDDH23_01
23.8
25
1.2
660
0
120,231
1,991
BMDDH23_01
32.5
32.9
0.3
1,258
0
129,887
3,958
BMDDH23_01
36.8
37.6
0.9
610
79
80,607
3,540
BMDDH23_01
39.2
39.7
0.5
479
46
71,688
3,829
BMDDH23_01
41.1
41.8
0.7
360
18
36,406
1,292
BMDDH23_01
42.7
43.1
0.4
777
34
110,999
3,778
BMDDH23_01
43.1
43.4
0.3
769
33
88,317
3,326
BMDDH23_01
44.9
45.5
0.6
671
30
86,750
3,640
BMDDH23_01
45.5
45.9
0.4
1,214
48
114,744
5,103
BMDDH23_01
47.2
47.5
0.3
1,222
76
119,702
3,017
BMDDH23_01
64
64.9
0.9
1,228
345
95,799
177
BMDDH23_01
121
121.7
0.7
3,891
154,412
28,970
9,931
<30
<30
<200
<50
<500
<30
<1000
<200
(a)
Typical Assay Values in areas without
Pyrite Veins
Pegmatites
Schist
a
Table 2: Intervals of vein and disseminated pyrite, pyrrhotite mineralisation from BMDDH23_01 showing Zn and Pb
values several times higher than what appears to be background in this area. Note (a): Sample sent for re-assay due
to exceptionally high Pb values. Refer to Appendix 3.
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
12
Figure 10: Zone of anomalous Zinc in soils to the north of the pyrite-pyrrhotite mineralisation intersected in
BMDDH23_01 (see Table 2) shown in relation to the outcropping pegmatites with soil sample locations showing Zn in
ppm. Refer to Appendix 4 for the complete set of soil geochemistry results.
2024 Black Mountain Exploration Plans
The Phase 1 Program at Black Mountain is scheduled to continue through until 1 March 2024, with the
objective of determining the three-dimensional shape and near-surface grades, down to 100m, within
the three major pegmatite dike zones as shown in Figure 1 and Figure 10. In addition to the eight (8)
holes already drilled, another seven holes are planned for the remainder of the Phase 1 Program,
which will conclude on 1 March 2024.
This information will be used to design a more extensive 5,000 to 10,000m initial resource definition
drill program expected to commence in Q3 2024 (the “Phase 2 (Resource Drilling) Program”).
Phase 2 (Resource Drilling) Program to Commence in Q3 2024
In anticipation of the Phase 2 Resource Drill Program, the initial focus will consist of detailed re-logging
of the Phase 1 Program drill core along with a detailed petrographic study of the mineralisation and
selection and submittal of samples for initial metallurgical testing. At the same time, the existing rock
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
13
chip and soil sampling program will be extended to the north and east to close off the open lithium
and base metal anomalies.
In addition, the Company plans to run a preliminary IP/Resistivity survey over the area of anomalous
Zn-Pb soil geochemistry to assist in siting several holes to test the nature of this base metal
mineralisation in Q3-Q4 2024 (see Figure 11).
Figure 11: IP/Resistivity survey over anomalous Zn-Pb soil geochemistry.
The Company is currently in the process of lodging an application for an EPO (to drill) in order to
expand the area of disturbance and increase the number of drill pads in preparation for a maiden
resource drill-out. The Phase 2 (Resource Drill) Program is expected to commence in the North
American summer in Q3 2024 or when the EPO is approved by the BLM. Refer to Figure 12 for an
indicative exploration timeline for Black Mountain.
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
14
Black Mountain
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Phase 1 Winter Drilling Program
Relog Phase 1 Core / Petrographic Study
Phase 1 Metallurgical Testing/ Study
Additional Rock Chip and Soil Geochemistry Survey
Phase 2 (Resource Drilling) Program
IP/Resistivity Program
Permitting - EPO
Figure 12: Indicative Black Mountain exploration timeline 1
Authorised on behalf of the Board of Directors.
Shanthar Pathmanathan
Managing Director
Chariot Corporation Ltd
1
The above timeline is indicative only and subject to change based on factor within and outside of the Company’s control.
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
15
Competent Person Statement - Exploration Results
Information in this announcement that relates to exploration results is based on information compiled
by Dr E Max Baker who is a Geological Consultant to Chariot. Dr Baker is a Fellow of The Australian
Institute of Mining and Metallurgy and has sufficient experience relevant to the style of mineralisation
and type of deposit under consideration and to the activity that he is undertaking, to qualify as
Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves". Dr Baker consents to the inclusion in this
announcement of the information pertaining to exploration results in the form and context in which
it appears.
Dr Baker holds 7,926,860 ordinary shares in Chariot (equal to a 5.3% interest in the undiluted shares
on issue of Chariot). Dr Baker is also engaged as a consultant by Chariot.
Important Notice
Statements in this announcement are made only as of the date of this announcement unless
otherwise stated and the information in this announcement remains subject to change without notice.
To the maximum extent permitted by law, neither Chariot nor any of its affiliates, related bodies
corporate, their respective officers, directors, employees, advisors and agents or any other person
accepts any liability as to or in relation to the accuracy or completeness of the information, statements,
opinions or matters (express or implied) arising out of, contained in or derived from this
announcement or any omission from this announcement or of any other written or oral information
or opinions provided now or in the future to any person.
This announcement may contain some references to forecasts, estimates, assumptions and other
forward-looking statements. Although the Company believes that its expectations, estimates and
projected outcomes are based on reasonable assumptions, it can give no assurance that they will be
achieved.
Cautionary Statement - Visual Estimates
This announcement contains references to visual results and visual estimates of mineralisation. The
Company draws attention to uncertainty in reporting visual results. Visual estimates of mineral
abundance should never be considered a proxy or substitute for laboratory analyses where
concentrations or grades are the factor of principal economic interest. Visual estimates also potentially
provide no information regarding impurities or deleterious physical properties relevant to valuations.
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
16
About Chariot
Chariot Corporation Limited is a mineral exploration company focused on discovering and developing
high-grade and near surface lithium opportunities in the United States. Chariot has twelve (12) lithium
projects, including two core projects (the “Core Projects”) and a number of exploration pipeline
projects which Chariot majority owns and operates. In addition, Chariot holds interests in a number
of projects which have either been sold or conditionally divested through option agreements to
publicly-listed companies (the “Divested Projects”).
The Core Projects include Chariot’s flagship Black Mountain Project (which is prospective for hard rock
lithium) in Wyoming, USA and the Resurgent Project (which is prospective for claystone lithium) in
Nevada and Oregon, USA. Initial survey results from the Core Projects indicate high-grade lithium
mineralisation at surface.
Chariot holds an interest in six exploration pipeline projects located in Wyoming, USA, including, the
Copper Mountain Project, the South Pass Project and four other hard rock lithium projects.
Chariot holds an interest in the Lida and Amargosa projects in Nevada, USA which are prospective for
claystone hosted lithium.
Chariot holds an interest in a hard rock lithium project in Zimbabwe which is prospective for
spodumene bearing pegmatites and an early-stage hard rock lithium exploration project in Western
Australia.
Each of the Divested Projects is operated or explored by Chariot’s publicly-listed counterparty under
the relevant sale or option agreement and, depending upon the particular transaction, may generate
additional revenues for Chariot dependent on the counterparty’s exploration success and financial
wherewithal, the achievement of prescribed milestones, the mere effluxion of time or the production
of saleable minerals payable under a net smelter royalty.
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
17
Appendix 1 – Drill Collar Table 1
EAST
(m)
NORTH
(m)
RL
(mASL)
DDH No
Azimuth
Dip
Depth
(m)
Assay Status
299884.9
4738509.2
2415.5
BMDDH23_01
260
-50
177.2
Assayed
299884.9
4738509.2
2415.5
BMDDH23_02
260
-65
42.4
Assayed
300193.2
4738176.0
2414.5
BMDDH23_03
160
-50
77.7
Assayed
300193.2
4738176.0
2414.5
BMDDH23_05
225
-45
158.2
Assays Pending
300193.2
4738176.0
2414.5
BMDDH23_06
225
-70
126.6
Assays Pending
300193.2
4738176.0
2414.5
BMDDH23_04
255
-50
69.5
Assays Pending
299785.7
4738489.5
2405.7
BMDDH23_09
290
-65
130
Assays Pending
299653.4
4738555.6
2365.0
BMDDH23_11
135
-40
200
Assays Pending
1 All coordinates are in NAD83 Z13N
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
18
Appendix 2 – Drill Assay Data
From
(m)
To (m)
Interval
(m)
Cu
(ppm)
Fe
(ppm)
Li (ppm)
Pb
(ppm)
S (ppm)
Ta
(ppm)
Zn
(ppm)
BMDDH23_01
0.0
1.2
1.2
34
26902
589
<LoD
257
35.3
95
BMDDH23_01
1.2
2.4
1.2
27
16217
134
<LoD
476
66.7
100
BMDDH23_01
2.4
2.7
0.3
<LoD
4456
189
<LoD
258
19.4
24
BMDDH23_01
2.7
3.2
0.5
<LoD
20995
1323
<LoD
249
37.1
40
BMDDH23_01
3.2
4.0
0.7
<LoD
6790
3551
<LoD
<LoD
41
51
BMDDH23_01
4.0
4.1
0.2
9
5225
148
<LoD
<LoD
42.1
43
BMDDH23_01
4.1
4.7
0.5
<LoD
6303
7256
<LoD
<LoD
41.3
23
BMDDH23_01
4.7
5.5
0.8
<LoD
7193
9969
<LoD
<LoD
65.6
34
BMDDH23_01
5.5
5.9
0.4
<LoD
6229
3146
<LoD
<LoD
50
40
BMDDH23_01
5.9
6.7
0.8
531
57694
355
<LoD
1712
9.1
119
BMDDH23_01
6.7
7.8
1.1
162
47846
200
<LoD
206
10.8
91
BMDDH23_01
7.8
9.5
1.7
204
86144
885
<LoD
268
2.1
211
BMDDH23_01
9.5
9.9
0.4
34
88335
1565
<LoD
<LoD
1.2
142
BMDDH23_01
9.9
10.5
0.6
<LoD
6080
7497
<LoD
<LoD
76.5
18
BMDDH23_01
10.5
11.0
0.5
<LoD
8447
14186
<LoD
238
88.3
33
BMDDH23_01
11.0
12.0
1.0
<LoD
7225
7555
<LoD
254
92.2
58
BMDDH23_01
12.0
12.7
0.7
<LoD
6806
9582
<LoD
<LoD
168.2
39
BMDDH23_01
12.7
13.1
0.4
<LoD
9184
17383
<LoD
<LoD
88.8
45
BMDDH23_01
13.1
13.7
0.6
<LoD
9397
17601
<LoD
<LoD
128.2
29
BMDDH23_01
13.7
14.2
0.5
<LoD
7039
11153
<LoD
<LoD
81.3
44
BMDDH23_01
14.2
14.7
0.5
<LoD
4525
4973
<LoD
<LoD
134.7
13
BMDDH23_01
14.7
15.3
0.6
<LoD
3937
2226
<LoD
<LoD
91.1
8
BMDDH23_01
15.3
16.0
0.7
<LoD
8459
9162
<LoD
<LoD
74.7
51
BMDDH23_01
16.0
16.4
0.4
8
28882
1183
<LoD
<LoD
53
106
BMDDH23_01
16.4
16.8
0.4
<LoD
8053
1405
<LoD
<LoD
104.5
72
BMDDH23_01
16.8
17.7
0.9
<LoD
5989
112
<LoD
<LoD
100.2
45
BMDDH23_01
17.7
18.2
0.5
<LoD
12826
2490
<LoD
<LoD
87.6
147
BMDDH23_01
18.2
18.7
0.5
<LoD
5989
76
<LoD
<LoD
49.1
64
BMDDH23_01
18.7
19.4
0.6
<LoD
7148
95
<LoD
<LoD
72.6
76
BMDDH23_01
19.4
20.1
0.7
22
21179
282
<LoD
<LoD
188.1
265
BMDDH23_01
20.1
20.7
0.6
249
128295
302
<LoD
1447
32.6
427
BMDDH23_01
20.7
21.5
0.8
32
21431
61
<LoD
<LoD
52.4
117
BMDDH23_01
21.5
21.9
0.5
51
19094
95
<LoD
<LoD
74.8
191
BMDDH23_01
21.9
22.6
0.6
63
24992
68
<LoD
<LoD
48.2
240
BMDDH23_01
22.6
23.4
0.9
115
109279
84
<LoD
11623
38.2
190
Hole_ID
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
19
Hole_ID
From
(m)
To (m)
Interval
(m)
Cu
(ppm)
Fe
(ppm)
Li (ppm)
Pb
(ppm)
S (ppm)
Ta
(ppm)
Zn
(ppm)
BMDDH23_01
23.4
23.8
0.3
6012
201027
100
<LoD
150328
66.5
1294
BMDDH23_01
23.8
25.0
1.2
660
159070
201
<LoD
120231
0.8
1991
BMDDH23_01
32.5
32.9
0.3
1258
159818
305
<LoD
129887
1.7
3958
BMDDH23_01
36.8
37.6
0.9
609.8
163569
161
79
80607
0.55
3540
BMDDH23_01
39.2
39.7
0.5
479.3
159839
452
46
71688
1.81
3829
BMDDH23_01
41.1
41.8
0.7
359.8
130186
27
18
36406
0.18
1292
BMDDH23_01
42.7
43.1
0.4
776.9
250000
313
34
110999
0.51
3778
BMDDH23_01
43.1
43.4
0.3
769.2
229656
371
33
88317
0.7
3326
BMDDH23_01
44.9
45.5
0.6
670.6
224385
149
30
86750
1.02
3640
BMDDH23_01
45.5
45.9
0.4
1213.5
250000
224
48
114744
0.51
5103
BMDDH23_01
47.2
47.5
0.3
1222.4
206162
254
76
119702
0.46
3017
BMDDH23_01
64.0
64.9
0.9
1227.8
157227
229
345
95799
1.54
177
BMDDH23_01
121.0
121.7
0.7
3891.2
149484
311
154412
28970
10.8
9931
BMDDH23_01
138.5
139.0
0.5
5
10234
54
<LoD
1037
82.4
291
BMDDH23_01
139.0
139.7
0.7
17
5116
16
<LoD
899
40.2
361
BMDDH23_01
139.7
140.1
0.4
<LoD
3646
30
<LoD
273
23.8
315
BMDDH23_01
140.1
140.7
0.6
<LoD
3601
17
<LoD
303
30.5
321
BMDDH23_01
140.7
141.1
0.4
<LoD
3382
8
<LoD
<LoD
16.1
295
BMDDH23_01
141.1
141.6
0.5
<LoD
2682
18
<LoD
204
6.4
345
BMDDH23_01
141.6
142.2
0.6
<LoD
4254
36
<LoD
533
30.6
442
BMDDH23_01
142.2
142.7
0.5
<LoD
5538
46
<LoD
290
34.9
261
BMDDH23_01
142.7
143.5
0.8
<LoD
7194
38
<LoD
<LoD
25.3
122
BMDDH23_01
143.5
145.4
1.9
32
98293
371
<LoD
505
3.5
2804
BMDDH23_01
145.4
146.3
0.9
10
107414
151
<LoD
215
4.3
2067
BMDDH23_01
146.3
147.0
0.6
<LoD
4625
29
<LoD
<LoD
29.2
226
BMDDH23_01
147.0
147.6
0.6
<LoD
4276
18
<LoD
<LoD
44.4
182
BMDDH23_01
147.6
148.1
0.5
<LoD
6114
62
<LoD
<LoD
71.4
141
BMDDH23_01
148.1
148.7
0.5
5
5160
32
<LoD
<LoD
19.8
177
BMDDH23_01
148.7
149.5
0.9
43
92231
157
<LoD
1827
4
1151
BMDDH23_01
172.5
173.2
0.7
128
144747
408
<LoD
19149
1.7
4242
BMDDH23_01
173.2
173.7
0.4
<LoD
20404
79
<LoD
371
62.5
820
BMDDH23_01
173.7
174.7
1.0
32
112291
237
<LoD
1322
2.5
1440
BMDDH23_02
0.0
0.8
0.8
25
75598
237
<LoD
<LoD
1.4
224
BMDDH23_02
0.8
1.2
0.5
7
76974
495
<LoD
<LoD
5
304
BMDDH23_02
1.2
1.8
0.6
27
72312
339
<LoD
<LoD
1.2
169
BMDDH23_02
1.8
2.7
0.9
<LoD
23584
769
<LoD
<LoD
53.2
90
BMDDH23_02
2.7
3.4
0.6
<LoD
10000
4949
<LoD
<LoD
42.5
104
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
20
From
(m)
To (m)
Interval
(m)
Cu
(ppm)
Fe
(ppm)
Li (ppm)
Pb
(ppm)
S (ppm)
Ta
(ppm)
Zn
(ppm)
BMDDH23_02
3.4
4.3
0.9
<LoD
57981
1250
<LoD
<LoD
14.9
168
BMDDH23_02
4.3
4.7
0.5
14
60538
1202
<LoD
<LoD
21.8
220
BMDDH23_02
4.7
5.3
0.6
<LoD
7708
8149
<LoD
<LoD
58.7
37
BMDDH23_02
5.3
5.9
0.6
<LoD
5999
3516
<LoD
<LoD
33
35
BMDDH23_02
5.9
6.6
0.6
43
63851
1895
<LoD
<LoD
3
75
BMDDH23_02
6.6
7.0
0.5
13
74942
1872
<LoD
<LoD
0.9
110
BMDDH23_02
7.0
9.6
2.6
16
70704
1823
<LoD
<LoD
2.5
121
BMDDH23_02
9.6
10.1
0.5
44
81958
1280
<LoD
<LoD
0.5
86
BMDDH23_02
10.1
10.7
0.6
22
92141
1573
<LoD
<LoD
2.1
111
BMDDH23_02
10.7
11.1
0.5
<LoD
8881
11404
<LoD
<LoD
117.6
35
BMDDH23_02
11.1
11.9
0.8
<LoD
11053
15472
<LoD
<LoD
136.4
73
BMDDH23_02
11.9
12.2
0.3
<LoD
11991
15766
<LoD
<LoD
71.4
84
BMDDH23_02
12.2
13.0
0.7
<LoD
10167
14384
<LoD
<LoD
104.2
57
BMDDH23_02
13.0
14.5
1.5
59
77195
729
<LoD
9777
97.7
417
BMDDH23_02
14.5
15.3
0.8
38
95135
518
<LoD
26132
81.5
164
BMDDH23_02
15.3
16.2
0.9
31
35979
1412
<LoD
3478
95.1
192
BMDDH23_02
16.2
17.0
0.9
27
36377
320
<LoD
2209
55.2
214
BMDDH23_02
17.0
17.7
0.6
158
134084
330
<LoD
16424
82.3
572
BMDDH23_02
17.7
18.4
0.7
242
163215
94
<LoD
32945
10.3
217
BMDDH23_02
18.4
19.2
0.8
190
176611
131
<LoD
28463
13.9
637
BMDDH23_02
19.2
20.2
1.0
103
131557
54
<LoD
16888
2.4
819
BMDDH23_02
20.2
21.2
1.0
44
128142
65
<LoD
26559
8.8
1189
BMDDH23_02
21.2
22.3
1.1
96
41534
80
<LoD
2863
130.4
465
BMDDH23_02
22.3
23.0
0.8
40
38851
113
<LoD
3976
70.2
278
BMDDH23_02
23.0
23.4
0.4
415
65441
138
<LoD
15252
93
317
BMDDH23_02
23.4
24.1
0.7
121
61499
82
<LoD
2263
34.7
671
BMDDH23_02
24.1
24.7
0.6
124
52638
77
<LoD
1530
68.4
549
BMDDH23_02
24.7
25.3
0.6
19
21962
61
<LoD
643
70.4
181
BMDDH23_02
25.3
26.2
0.9
202
86047
224
<LoD
305
29
942
BMDDH23_02
26.2
38.4
12.2
112
109919
188
<LoD
819
3.4
428
BMDDH23_02
38.4
39.6
1.2
59
107651
245
<LoD
<LoD
1.1
140
BMDDH23_02
39.6
39.9
0.3
<LoD
9747
80
<LoD
<LoD
46.3
59
BMDDH23_02
39.9
41.1
1.2
38
107547
302
<LoD
<LoD
1.5
125
BMDDH23_03
39.3
39.9
0.6
43
91907
255
<LoD
647
1.6
101
BMDDH23_03
39.9
40.8
0.9
32
90802
237
<LoD
<LoD
1.5
96
BMDDH23_03
40.8
40.9
0.2
61
84235
234
<LoD
1818
1.3
103
BMDDH23_03
40.9
42.1
1.1
23
83816
246
<LoD
650
7.1
94
Hole_ID
Level 8, 216 St Georges Terrace Perth WA 6000
chariotcorporation.com
ABN 13 637 559 847
21
Hole_ID
From
(m)
Share your feedback
Discover