Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
1
ASX Announcement 30 January 2026
ACTIVITIES REPORT – Quarter Ending 31 December 2025
HIGHLIGHTS
• Nigerian Projects:
o Verification sampling at Fonlo and Iganna returned high-grade lithium assays of
up to 5.96% Li₂O; pending mineralogical analysis, lithium minerals identified are
believed to be spodumene- and lepidolite-bearing mineralisation; tantalum and
caesium were identified in certain samples as potential by-products.
o Site inspections and desktop review support the presence of extensive LCT
pegmatite systems, including near-vertical pegmatite dykes at Fonlo and
shallow-dipping pegmatite sills at Iganna, consistent with historical artisanal
lithium mining activity.
o A staged development pathway is being progressed, including evaluation of
small-scale mining options in parallel with systematic exploration and drilling,
subject to acquisition completion and required approvals.
o A variation deed was executed to amend the acquisition arrangements,
strengthening exclusivity and non-circumvention provisions, revising certain
conditions precedent and extending the end date for satisfaction of those
conditions to 5 May 2026.
o After quarter end, non-binding MOUs were signed with China-based lithium
supply chain participants to evaluate potential DSO and spodumene
concentrate offtake, offtake-linked prepayment/credit financing and Nigeria-
based processing options.
• U.S. Portfolio: 32 high-priority drilling targets were defined across the Resurgent
Project in the McDermitt Caldera, adjacent to the Thacker Pass and McDermitt
developments.
• OTCQB Listing Completed: In November 2025, Chariot completed a secondary listing on
the OTCQB Market in the United States under the ticker code “CHRTF”. No new shares
were issued and there was no change to the Company’s capital structure.
2
INTRODUCTION
Chariot Resources Limited (“Chariot” or the “Company”) presents its Quarterly Activities Report for the
quarter ended 31 December 2025. During the quarter, the Company progressed technical validation
and development pathway workstreams for its soon-to-be-acquired Nigerian lithium portfolio (subject
to acquisition completion*
) and advanced its United States lithium assets, including defining 32 drilling
targets at Resurgent. Subsequent to quarter end, Chariot announced non-binding MOUs relating to
potential offtake and financing pathways for the Nigerian projects.
OPERATIONS
Nigerian Lithium Portfolio
During the quarter, Chariot progressed technical validation of the Nigerian lithium portfolio through
targeted site inspections, sampling and desktop review activities while advancing workstreams to
complete the acquisition. Work completed during the period focused on confirming lithium
mineralisation at historical artisanal workings and defining development pathways for the projects.
Figure 1- Map showing the location of the four project areas in Nigeria.
*
Completion of Chariot’s acquisition of the Nigerian lithium portfolio has not yet occurred and remains subject to satisfaction
(or waiver) of conditions precedent, including the transfer of the 8 exploration licenses and 2 small scale mining licenses to C&C
Minerals Limited, a Nigerian company which is held jointly by Chariot (66.667%) and Continental Lithium Limited (33.333%).
3
Geological Validation and Project Scale
Targeted site inspections, together with a review of historical artisanal workings and previously
disclosed information, support the presence of extensive lithium-bearing LCT pegmatite systems
across the Nigerian lithium portfolio.
Cautionary Statement Regarding Visual Observations of Mineralisation
The identification of spodumene and other lithium-bearing minerals in the field during the site visits
was based on visual inspection only, but is supported by previous sampling conducted by Continental
Lithium Limited as reported in Chariot’s July 10 announcement and further substantiated by significant
sales of product extracted by artisanal miners over a number of years. Chariot has sent a selection of
the samples for mineralogical analysis to confirm the presence of spodumene and other lithium-
bearing minerals.
Fonlo Project (previously reported site observations)
Previously reported site observations at Fonlo describe a north–south ~6 km cumulative strike length
trend of near-vertical pegmatite dykes exposed in old pits and road cuttings, with individual dykes
attaining thicknesses of up to ~20 m. At the main pit examined, a composite vertical dyke spans a ~40
m wide pit with branching dykes; the main central dyke is ~10–20 m wide and increases to
approximately ~30 m at the base of the observable excavated pit. Coarse-grained pale green
spodumene (hiddenite) occurs as large crystals up to ~50 cm long within a quartz–feldspar matrix.
Extensive outcrops and the historical and recently active artisanal workings provide immediate walk-
up drilling targets for the exploration program. The Fonlo project area is generally covered by 1–3 m of
colluvium/alluvium overburden and strong potential exists for wider and more extensive dyke
complexes to be discovered under cover once systematic exploration commences. Based on visual
observations, Chariot expects the Fonlo spodumene mineralisation to be amenable to simple dense
media separation (DMS) recovery with planned metallurgical test work to provide confirmation.
Iganna Project (previously reported site observations)
Previously reported site observations at Iganna describe multiple shallow-dipping pegmatite sills. One
notable LCT pegmatite was observed to average 5–10 m in thickness and was traced for several
hundred metres along strike at surface, with numerous shallow pits and a vertical shaft (~50 m deep)
developed along the pegmatite. Coarse spodumene (cream and pale pink (kunzite) is visible in pit wall
exposures and waste dump piles, accompanied by lepidolite overprinting and minor accessory lithium
minerals. Extensive waste dumps and workings evidence substantial historical production from Iganna,
indicating a significant lithium endowment near surface. Structural observations also point to the
possibility of stacked (multiple) pegmatite sills at Iganna, which could significantly add to the project’s
scale if confirmed by drilling.
4
Figure 2 - Artisanal mining pit at Fonlo (LHS) showing near-vertical contact between metabasalt
and pegmatite (dark and light coloured respectively). Large spodumene crystal at Fonlo (RHS).
Figure 3 - Dr Edward Baker and David Kwarteng at Iganna (LHS) examining material from the
nearby shaft. Rock chip from Iganna (RHS).
5
High-Grade Lithium Assay Results
Laboratory analysis returned high-grade lithium results, with assays of up to 5.96% Li₂O reported from
samples collected at Fonlo and Iganna. Pending confirmation through a forthcoming mineralogical
analysis, the lithium minerals identified are dominated by spodumene at Fonlo and spodumene and
lepidolite at Iganna. The results validated the historical artisanal mining activity observed across both
projects. Associated elements, including tantalum and caesium, were also identified in certain samples.
As previously announced, twenty-three (23) samples were collected on the site visit. Six of these are
verification samples for chemical analysis and the remaining seventeen are bulk metallurgical samples
of various materials.
The methods employed by the artisanal miners at the sites – which involve no more beneficiation than
the removal of gangue with hand tools – are indicative of the ore’s expected amenability to simple
dense media separation (DMS) recovery, subject to confirmation by metallurgical test work.
Figure 4 - Fonlo maps showing assay results.
6
Figure 5 - Sample of spodumene, quartz and muscovite collected from
Fonlo (Top). Brendan Borg (Director) with a spodumene-bearing rock chip
(LHS). Dr Edward Max Baker at Fonlo (RHS).
7
Figure 6 - Iganna project map showing area visited and sample assay results.
Small-Scale Mining Development Strategy
Chariot, Continental Lithium Limited and C&C Minerals Limited entered into a binding, conditional
agreement to formalise and pursue small-scale mining at the Nigerian projects, subject to completion
of the acquisition and required approvals. The small-scale mining pathway is intended to leverage
existing artisanal mining activity and the near-surface nature of mineralisation, while larger-scale
exploration and drilling programs are advanced in parallel.
8
Development Potential and Exploration Strategy (previously reported)
The confirmation of near-surface lithium mineralisation at Fonlo and Iganna and the presence of
significant artisanal mining operations support a dual-track development approach:
• Initiate Small-Scale Mining Operations (“SSMO”): Subject to completion of the acquisition and
raising required funds, Chariot and Continental Lithium Limited plan to expand on existing
artisanal mining operations and introduce mechanised equipment to target early revenue from
the sale of lithium ore/concentrate while larger-scale exploration proceeds.
o SSMO will be progressed via a three-phase de-risking program: (1) targeted mapping and
drilling to support definition of a local JORC-compliant resource; (2) metallurgical testing to
confirm processing routes and recoveries (including potential by-products); and, (3)
assessment of toll processing and logistics options versus modular on-site processing to
optimise capital and time to market.
• Systematic Exploration for a Large-scale Discovery: In parallel with the initiation of SSMO, a
systematic exploration program is planned with the objective of delineating JORC-compliant
Mineral Resources supportive of large-scale mining operations.
o Subject to completion of the acquisition and raising required funds, the systematic exploration
program includes detailed geological mapping and channel sampling, geophysical methods
and geochemical sampling, and an initial diamond drilling program planned to commence
shortly after completion of the acquisition.
Figure 7 - Shanthar Pathmanathan (Executive Chairman and Managing Director), Brendan Borg (Non-
Executive Director), Dr Edward Max Baker (Co-founder and Consultant Geologist) and David Kwarteng
(Chief Geologist at Continental Lithium Limited) with local community members.
9
Nigerian Portfolio Acquisition Update
• In November 2025, Chariot executed a variation deed to amend the original share sale agreement
governing the acquisition of the Nigerian lithium portfolio. Key updates included:
o Strengthened exclusivity and non-circumvention provisions;
o Revisions to certain conditions precedent; and
o An extension of the end date to 5 May 2026 for satisfaction of conditions precedent.
The amended arrangements also established funding mechanisms to facilitate the transfer of the
Nigerian licences to C&C Minerals Limited, providing a defined pathway to completion of the
acquisition.
Strategic Offtake and Financing MOUs (Post-Quarter Events)
Subsequent to quarter end, Chariot announced two separate non-binding MOUs with China-based
lithium supply chain participants to explore potential offtake and financing pathways for the Nigerian
assets. Key elements include:
• Potential sale and delivery of direct shipping ore (DSO) to a collection point at Sagamu, Nigeria;
• Potential long-term offtake of spodumene concentrate (or other lithium-bearing products) from a
selected Nigerian project;
• Discussions regarding credit lines and offtake prepayment financing to support exploration and
development; and
• Evaluation of Nigeria-based lithium processing infrastructure to convert run-of-mine ore into
spodumene concentrate.
Binding agreements under the MOUs remain subject to completion of the acquisition of the Nigerian
assets, satisfactory due diligence, permitting and negotiation of definitive terms.
United States Lithium Portfolio
Resurgent Project – Drilling Targets Defined
During the quarter, Chariot defined 32 high-priority lithium drilling targets across its Resurgent Project
in the McDermitt Caldera on the Nevada–Oregon border, adjacent to the Thacker Pass and McDermitt
developments. The targets were defined based on previously disclosed surface sampling and are
intended to support a phased maiden drilling program, subject to permitting.
10
Figure 8 - Phase 1 Drilling Program – West Resurgent North (ID# 23-0300)
A proposed Phase 1 drilling layout for the West Resurgent North area illustrates indicative drill pad
locations and access tracks designed to minimise surface disturbance.
11
CORPORATE
OTCQB Listing
In November 2025, Chariot completed a secondary listing on the OTCQB Market in the United States
under the ticker code “CHRTF”. The OTCQB listing is intended to broaden the Company’s North
American investor base and improve accessibility for U.S. institutional and retail investors, while
maintaining the Company’s primary ASX listing. No new shares were issued and there was no change
to the Company’s capital structure.
FINANCIAL & RELATED PARTY TRANSACTION
The Company’s Quarterly Cashflow Report (Appendix 5B) follows this activities report. Chariot group
companies collectively held approximately A$0.77 million of cash as at 31 December 2025. Chariot
group companies have A$2.6 million in borrowings.
Exploration expenditure during the quarter was approximately A$0.16 million and tenement
acquisition costs of A$0.31 million mainly related to transfer fees.
The total amount paid by the Company to related parties and their associates during the quarter
totalled A$157,000 for directors’ fees, superannuation and expense reimbursements paid to directors
(as per item 6.1 and 6.2 of Appendix 5B).
USE OF FUNDS
As required by ASX Listing Rule 5.3.4, the Company provides the following information with respect to
its Use of Funds Statement set out in its Supplementary Prospectus dated 25 September 2023 and its
actual expenditures since its ASX admission on 27 October 2023.
Expenditure Funds allocated
under Prospectus
(A$’000)
Actual 27 October
2023 to 31 December
2025 (A$’000)
Variance
(A$’000)
Note
Exploration $7,167 $7,959 $792
Administration &
Compliance
$3,344 $5,336 $1,922 1
Working Capital $133 ($5,153) ($5,287) 2
Cost of Offer $563 $869 $306 3
Total $11,207 $10,679
Notes:
1. The variance is largely due to higher than anticipated marketing expenses.
12
2. The Company completed a further capital raisings during the period.
3. Expenses of the Offer were higher due to the extension of the IPO Offer period and lead manager
legal counsel expenses exceeding expectations.
TENEMENTS
The soon-to-be-acquired exploration licenses and small-scale mining licenses in Nigeria will be
included in this section upon completion of the acquisition.
Project Location Claims
Interest on ASX
listing
Interest at end
of quarter
Black Mountain1
Wyoming, USA 89 91.9% 93.9%
Copper Mountain2
Wyoming, USA 37 91.9% 93.9%
Tin Cup Wyoming, USA 22 91.9% 93.9%
Resurgent Nevada / Oregon, USA 597 79.4% 79.4%
Horizon Nevada, USA 839 0% 24.0%
Halo Nevada, USA 98 0% 24.0%
Notes:
1. Subject to an Exploration and Secured Option Agreement with Black Mountain Lithium Corp.
over 27 Claims and a Mining Lease with Option to Purchase Agreement with Vesper Resources
LLC over two (2) Claims.
2. Subject to a Mining Lease with Option to Purchase Agreement with Vesper Resources LLC over
two (2) claims.
ASX ANNOUNCEMENTS DURING THE PERIOD
Date Announcement
1 October 2025 Chariot to Pursue U.S. OTCQB Listing
2 October 2025 Drilling Targets Defined at Resurgent Project
14 October 2025 Significant Lithium Pegmatites Observed at Nigerian Projects
7 November 2025 OTCQB Listing Successfully Completed
24 November 2025 Small-Scale Mining to be Pursued at Nigerian Projects
3 December 2025 Nigerian Portfolio Acquisition Update
4 December 2025 High-Grade Assays at Fonlo and Iganna of up to 5.96% Li₂O
13
Date Announcement
2 January 2026 Shanghai GreatPower MOU for Financing and Offtake*
8 January 2026 Jinjianqiao MOU for Financing and Offtake*
Authorised on behalf of the Board of Directors.
Shanthar Pathmanathan
Executive Chairman & Managing Director
Chariot Resources Ltd
*
Post-quarter events.
14
Important Notice
Statements in this announcement are made only as of the date of this announcement unless
otherwise stated and the information in this announcement remains subject to change without notice.
To the maximum extent permitted by law, neither Chariot nor any of its affiliates, related bodies
corporate, their respective officers, directors, employees, advisors and agents or any other person
accepts any liability as to or in relation to the accuracy or completeness of the information,
statements, opinions or matters (express or implied) arising out of, contained in or derived from this
announcement or any omission from this announcement or of any other written or oral information
or opinions provided now or in the future to any person.
This announcement may contain some references to forecasts, estimates, assumptions and other
forward-looking statements. Although the Company believes that its expectations, estimates and
projected outcomes are based on reasonable assumptions, it can give no assurance that they will be
achieved.
15
About Chariot
Chariot Resources Limited is a mineral exploration company focused on discovering and developing
high-grade and near surface lithium opportunities focused principally in the United States and Nigeria.
In addition to the recently announced acquisition of a Nigerian lithium portfolio which has yet to close,
Chariot has twelve (12) lithium projects, including two core projects in the United States (the “Core
Projects”) and a number of exploration pipeline projects which Chariot majority owns and operates.
The Core Projects include Chariot’s Black Mountain Project (which is prospective for hard rock lithium)
in Wyoming, USA and the Resurgent Project (which is prospective for claystone lithium) in Nevada and
Oregon, USA. Initial survey results from the Core Projects indicate high-grade lithium mineralisation
at surface.
The Nigerian portfolio of hard-rock lithium assets consists of four project clusters (Fonlo, Gbugbu,
Iganna, and Saki) in the Oyo and Kwara states which cover approximately 254 square kilometers and
are comprised of 8 exploration licences and 2 small-scale mining leases. These assets represent one
of the largest portfolios of lithium assets in the country and have a history of significant artisanal
lithium mining. Chariot anticipates completing the acquisition of the Nigerian portfolio in the first
quarter of this calendar year.
Chariot also holds an interest in six exploration pipeline projects located in Wyoming, USA, including
the Copper Mountain Project, the South Pass Project and four other hard rock lithium projects.
Chariot also holds an interest in applications for seven (7) exploration licences in the highly prospective
Southern Cross Greenstone Belt, Western Australia. The Southern Cross Greenstone Belt, one of
Western Australia’s most significant gold-producing regions with over 150 mines, is now emerging as
a key region for LCT pegmatites.
Chariot holds an interest in a hard rock lithium project in Zimbabwe. The Zimbabwe project licences
are in the process of being relinquished.
In addition, Chariot holds a portfolio interest in certain properties prospective for claystone hosted
lithium located in the State of Nevada in the United States through its interest in Mustang Lithium LLC.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Chariot Resources Limited
ABN Quarter ended (“current quarter”)
13 637 559 847 31 December 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(156) (1,138)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (195) (416)
(e) administration and corporate costs (433) (1,495)
1.3 Dividends received (see note 3) - 72
1.4 Interest received 1 1
1.5 Interest and other costs of finance paid (108) (331)
1.6 Income taxes (paid) / refunded - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material) - 1
1.9 Net cash from / (used in) operating
activities
(891) (3,306)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements (314) (934)
(c) property, plant and equipment - -
(d) exploration & evaluation - -
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - 113
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(314) (821)
3. Cash flows from financing activities
250 2,135
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- 600
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(69) (316)
3.5 Proceeds from borrowings 1,200 2,932
3.6 Repayment of borrowings - (865)
3.7 Transaction costs related to loans and
borrowings
(84) (255)
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing
activities
1,297 4,231
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
682 673
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(891) (3,306)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(314) (821)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
1,297 4,231
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
(4) (7)
4.6 Cash and cash equivalents at end of
period
770 770
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 651 651
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (Term Deposit) 31 31
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
770 682
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
157
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities 2,800 2,800
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities 2,800 2,800
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
Existing Working Capital Facility (originally unsecured): Chariot’s working capital facility with
GAM (original principal A$880,000) was increased to A$1.6 million under an amended
agreement on 27 August 2025 (“August 2025 Loan”). To date, A$132,000 of the initial
advance has been repaid. Interest on this facility is pre-paid by being deducted from each
drawdown (for example, A$144,000 of interest was withheld upfront on the A$852,000
second advance). The outstanding loan amount is due six months from the 27 August 2025
amendment (maturing around late February 2026).
October 2025 Loan: The Company has executed a new A$1.2 million secured loan with
GAM. This loan carries interest at 18% per annum (with the first six months’ interest of
A$108,000 pre-paid and withheld from the advance) and a 12-month term to maturity. The
loan is secured by a general security charge over all present and future assets of the
Company.
For further details please refer to the ASX announcement on 31 October 2025 titled
Additional Loan Funding Obtained.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (891)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
-
8.3 Total relevant outgoings (item 8.1 + item 8.2) (891)
8.4 Cash and cash equivalents at quarter end (item 4.6) 770
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 770
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.86
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Yes.
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: The company is exploring future capital raising options and non-dilutive funding
options. The board believes that it would be successful in raising further cash from
capital raising options and/or non-dilutive funding options.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: The Company expects to be able to continue its operations and meet its business
objectives based on the following initiatives:
1. Capital Raising Initiatives: The Company is actively pursuing a number of funding
options, including share placements, strategic partnerships and non-dilutive funding
opportunities.
2. Cost Management: The Company is implementing cost-control measures to
prioritise expenditures that directly support critical business objectives and preserve
its cash.
3. Asset Optimisation: The Company and its affiliates continue to evaluate
opportunities to monetise non-core assets in order to bolster its cash position.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 30 January 2025
Authorised by: By the Board
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 6
+ See chapter 19 of the ASX Listing Rules for defined terms.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a co
Share your feedback
Discover