Prospectus - part 2
Released
Released
Announcement PDF
Annexures
CLAYSTONE LITHIUM
Resurgent East
Resurgent North
NEVADA
This page has been left intentionally blank
172
Chariot Corporation Ltd. | PROSPECTUS
Annexure A – Independent Technical Assessment Report (Wyoming Lithium and Nyamukono Projects)
MINERAL ASSETS OF
CHARIOT CORPORATION LTD
Independent Technical
Assessment Report
REPORT Nº R133.2023
16 August 2023
Chariot Corporation Ltd. | PROSPECTUS
173
Annexure A – Independent Technical Assessment Report (Wyoming Lithium and Nyamukono Projects) (cont.)
CHARIOT CORPORATION LTD
INDEPENDENT TECHNICAL ASSESSMENT REPORT
Report prepared for
Client Name
Project Name/Job Code
Chariot Corporation Ltd
CHAITA01
Contact Name
Nathan Kong
Contact Title
Corporate Development Manager
30/118 Royal Street, East Perth, 6004, WA
Office Address
Report issued by
ERM Australia Consultants Pty Ltd trading as CSA Global
CSA Global Office
Level 3, 1-5 Havelock Street
West Perth WA 6005
AUSTRALIA
T +61 8 9355 1677
F +61 8 9355 1977
E info@csaglobal.com
Division
Corporate
Report information
Filename
Last Edited
Report Status
R133.2023 CHAITA01 Chariot ITAR FINAL ClientCopy (20230822) SIGNED (VER4).docx
22/08/2023 5:19 PM
Final
Author and Reviewer Signatures
Coordinating Author
Michael Cronwright
MSc (Geol), PrSciNat, FGSSA
Contributing Author
Mark Allen
BA, BA (mod), PhD, MAIG
Contributing Author
Charlie Gianfriddo
BSc Hons, MAIG
Peer Reviewer
Max Nind
MSc, GDipAppFinInv, MAIG
CSA Global
Authorisation
Graham Jeffress
BSc (Hons) Applied Geology, RPGeo,
FAIG, FAusIMM, FSEG, MGSA
© Copyright 2023
CSA Global Report Nº R133.2023
174
Chariot Corporation Ltd. | PROSPECTUS
I
CHARIOT CORPORATION LTD
INDEPENDENT TECHNICAL ASSESSMENT REPORT
Executive Summary
ERM Australia Consultants Pty Ltd trading as CSA Global (CSA Global) , was requested by Chariot Corporation
Limited (Chariot) to prepare an Independent Technical Assessment Report (ITAR) for use in a Prospectus to
support an initial public offering (IPO) of shares for Chariot to enable a listing on the Australian Securities
Exchange (ASX). The funds raised will be used for the purpose of exploration and evaluation of the project
areas.
The ITAR relates to Chariot’s seven (7) hardrock (pegmatite) hosted lithium projects in the state of Wyoming
in the United States of America (USA). This ITAR is a summary and review of historical and recent exploration
data and reports provided. Chariot holds a number of lithium exploration licences in Zimbabwe, the
Nyamukono project, but does not intend developing the project and is looking at options to divest these.
Chariot also holds a number of claystone-hosted lithium projects located in the USA that does not form part
of this ITAR but is discussed in a separate ITAR prepared by SRK that is included elsewhere in this Prospectus.
The funds raised under the Prospectus will be used for the purposes of exploration and evaluation of the
Projects.
The ITAR details the seven projects located in Wyoming reflecting tenements grouped spatially and by similar
geology. The Projects comprise early-stage exploration projects and require the execution of a phased
exploration programme to confirm and define the pegmatite-hosted lithium mineralisation as described in
historical reports and recent exploration conducted by Chariot.
The more advanced being Black Mountain where Chariot has conducted some early-stage exploration and
Copper Mountain. Prospectivity is supported by outcropping examples of pegmatites with lithium minerals.
The scale and extent of lithium mineralisation is not well constrained.
The Black Mountain Project comprises 134 mineral claims. The claim block covers Archaean rocks with
spodumene bearing pegmatites at two localities. The project area has not been the subject of systematic
exploration for lithium-caesium-tantalum pegmatites. Assay results of reconnaissance sampling of
outcropping pegmatites had eight out of 22 samples collected from outcropping pegmatites with 4% Li2O or
greater, confirming the presence of significant lithium mineralisation in these samples.
The Copper Mountain Project in Wyoming comprises 83 mineral claims. The claim block covers Archaean
rocks with lepidolite, petalite and amblygonite-montebrasite bearing pegmatites. The project area has not
been the subject of systematic exploration for LCT pegmatites.
Chariot has five other projects which are at an early stage of exploration on the northern margin on the
Granite Mountains and the South Pass Project in the Wind River Range. Chariot consider that these are
prospective for LCT mineralisation, with encouraging observations from initial field studies.
Chariot is in the early stages of exploration for these projects and has identified a number of spectral
anomalies that are targets for LCT pegmatite mineralisation which require follow-up geological investigation.
The last prospecting that was done on the pegmatites of the Black Mountain and Copper Mountain projects
was at least 30 years ago with the most intensive exploration and mining activity having taken in the earlyto mid-1900’s. At this time mining and exploration techniques were less refined than today. The projects are
considered to have good potential for the discovery and/or delineation of pegmatite-hosted mineralisation,
which includes lithium, tin, tantalum and a variety of industrial minerals such as feldspar, mica and beryl
through the application of modern exploration techniques.
There is also broader regional potential for the discovery of lithium-bearing LCT pegmatites within the Tin
Cup, South Pass, JC, Barlow Gap and Pathfinder projects, where pegmatites have either been documented or
been interpreted to occur from first pass satellite image interpretation conducted by the Company.
It is the opinion of CSA Global that Chariot’s exploration strategy is of sound technical merit and the projects
are considered to have sufficient potential to warrant the proposed exploration activities.
CSA Global Report Nº R133.2023
II
Chariot Corporation Ltd. | PROSPECTUS
175
Annexure A – Independent Technical Assessment Report (Wyoming Lithium and Nyamukono Projects) (cont.)
CHARIOT CORPORATION LTD
INDEPENDENT TECHNICAL ASSESSMENT REPORT
CSA Global concurs with Chariot’s approach and considers that the LCT pegmatite model for Wyoming
projects is based on reasonable geological interpretation of the available data.
Chariot has demonstrated that historical exploration on its project areas has not systematically tested the
style of mineralisation to be targeted. CSA Global recommends that exploration be prioritised at Black
Mountain, followed by Copper Mountain, South Pass with more regional type exploration on the Tin Cup, JC,
Barlow Gap and Pathfinder projects.
CSA Global notes that the exploration being undertaken by Chariot is at an early stage. The risks inherent in
these projects are therefore high.
The exploration and evaluation programme for the Company’s hard rock lithium projects in Wyoming for the
next 2 years, post IPO, is based on a A$15.5 million capital raising. The programme for these projects
summarised on the ITAR amount to a total expenditure of A$9.5 million of which Chariot intend spending
A$5.2 million on the Black Mountain Project, A$2.3 million on the Copper Mountain Project, A$1.0 million on
the South Pass Project and A$1 million on the Wyoming Regional projects (namely Tin Cup, JC, Barlow Gap
and Pathfinder projects).
The Company has prepared staged exploration and evaluation programs, specific to the potential of the
Projects, which are consistent with the budget allocation, and warranted by the exploration potential of the
Projects. CSA Global has reviewed Chariot’s exploration programs for the Wyoming projects for the next 2
years and considers them appropriate and the proposed budgets adequate to cover the costs thereof.
CSA Global Report Nº R133.2023
176
Chariot Corporation Ltd. | PROSPECTUS
III
CHARIOT CORPORATION LTD
INDEPENDENT TECHNICAL ASSESSMENT REPORT
Contents
Report prepared for .................................................................................................................................................. I
Report issued by ....................................................................................................................................................... I
Report information ................................................................................................................................................... I
Author and Reviewer Signatures .............................................................................................................................. I
EXECUTIVE SUMMARY ................................................................................................................................................ II
1
2
3
4
INTRODUCTION ................................................................................................................................................ 8
1.1
Context, Scope, and Terms of Reference ..................................................................................................... 8
1.2
Compliance with the VALMIN and JORC Codes .......................................................................................... 10
1.3
Principal Sources of Information and Reliance on Other Experts .............................................................. 10
1.4
Authors of the Report ................................................................................................................................. 10
1.5
Independence ............................................................................................................................................. 11
1.6
Declarations ................................................................................................................................................ 12
1.6.1
Purpose of this Document ................................................................................................................. 12
1.6.2
Practitioner/Competent Person’s Statement .................................................................................... 12
1.6.3
Site Inspection ................................................................................................................................... 12
1.7
About this Report ....................................................................................................................................... 12
OWNERSHIP, AGREEMENTS AND TENURE ...................................................................................................... 13
2.1
Project Ownership and Agreements ........................................................................................................... 13
2.2
Wyoming (United States of America) ......................................................................................................... 14
LITHIUM MARKET ........................................................................................................................................... 16
3.1
History of Lithium Production in the United States of America ................................................................. 20
3.2
Critical Minerals in the United States of America....................................................................................... 20
DEPOSIT MODEL FOR LCT PEGMATITES .......................................................................................................... 22
4.1
5
Lithium Mineral Processing ........................................................................................................................ 27
WYOMING PROJECTS – UNITED STATES OF AMERICA .................................................................................... 29
5.1
Location and Access.................................................................................................................................... 29
5.1.1
Black Mountain ................................................................................................................................. 29
5.1.2
Copper Mountain .............................................................................................................................. 30
5.1.3
Tin Cup Mountain .............................................................................................................................. 31
5.1.4
Jeffrey City (JC) .................................................................................................................................. 31
5.1.5
South Pass ......................................................................................................................................... 32
5.1.6
Barlow Gap ........................................................................................................................................ 33
5.1.7
Pathfinder .......................................................................................................................................... 33
5.2
Topography, Vegetation and Climate ......................................................................................................... 34
5.3
Local Resources and Infrastructure ............................................................................................................ 35
5.4
Geology and Metallogeny........................................................................................................................... 36
5.4.1
Regional Geology ............................................................................................................................... 36
5.4.2
Black Mountain ................................................................................................................................. 40
5.4.3
Copper Mountain .............................................................................................................................. 42
5.4.4
Tin Cup Mountain .............................................................................................................................. 44
5.4.5
South Pass ......................................................................................................................................... 45
5.4.6
Jeffrey City (JC) .................................................................................................................................. 47
5.4.7
Barlow Gap ........................................................................................................................................ 47
CSA Global Report Nº R133.2023
IV
Chariot Corporation Ltd. | PROSPECTUS
177
Annexure A – Independent Technical Assessment Report (Wyoming Lithium and Nyamukono Projects) (cont.)
CHARIOT CORPORATION LTD
INDEPENDENT TECHNICAL ASSESSMENT REPORT
5.4.8
Pathfinder .......................................................................................................................................... 48
5.5
Exploration History ..................................................................................................................................... 49
5.5.1
Exploration of Pegmatites ................................................................................................................. 49
5.5.2
Exploration for Other Commodities .................................................................................................. 51
5.6
Exploration Rationale ................................................................................................................................. 52
5.7
Recent Exploration ..................................................................................................................................... 52
5.7.1
Black Mountain ................................................................................................................................. 52
5.7.2
Copper Mountain .............................................................................................................................. 59
5.7.3
Tin Cup Mountain .............................................................................................................................. 61
5.7.4
South Pass ......................................................................................................................................... 63
5.7.5
Jeffrey City (JC) .................................................................................................................................. 64
5.7.6
Barlow Gap ........................................................................................................................................ 65
5.7.7
Pathfinder .......................................................................................................................................... 65
5.8
Future Work................................................................................................................................................ 66
6
ZIMBABWE - NYAMUKONO PROJECT ............................................................................................................. 67
7
ENVIRONMENTAL, SOCIAL AND GOVERNANCE FACTORS ............................................................................... 69
8
TECHNICAL OPPORTUNITIES AND RISKS ......................................................................................................... 70
9
PROPOSED EXPLORATION WORK AND BUDGET ............................................................................................. 71
9.1
Black Mountain ........................................................................................................................................... 72
9.2
Copper Mountain ....................................................................................................................................... 72
9.3
South Pass................................................................................................................................................... 73
9.4
Wyoming Regional ...................................................................................................................................... 73
9.5
CSA Global Opinion ..................................................................................................................................... 73
10
CONCLUSIONS ................................................................................................................................................ 74
11
REFERENCES ................................................................................................................................................... 75
11.1
Wyoming References .................................................................................................................................. 75
11.2
Zimbabwe References ................................................................................................................................ 76
12
GLOSSARY ...................................................................................................................................................... 78
13
ABBREVIATIONS AND UNITS OF MEASUREMENT ........................................................................................... 80
Figures
Figure 1-1:
Figure 2-1:
Figure 2-2:
Figure 3-1:
Figure 3-2:
Figure 3-3:
Figure 3-4:
Figure 3-5:
Figure 4-1:
Figure 4-2:
Figure 4-3:
Figure 4-4:
Location of Chariot tenements in Wyoming (UTM Zone 13N NAD 83) .......................................................................... 9
Corporate structure for Chariot’s Wyoming and Resurgent projects. .......................................................................... 13
Location of Chariot tenements in Wyoming (UTM Zone 13N NAD 83) ........................................................................ 14
Global lithium reserves by deposit type ....................................................................................................................... 16
Comparison of lithium applications and consumption between 2015 and 2021 ......................................................... 16
Current and future lithium supply by geography (top) and deposit type (bottom) ..................................................... 18
Lithium carbonate price trend from 2018 to 20 Feb 2022 (1CNY = 0.15USD) .............................................................. 19
Global lithium supply by company ............................................................................................................................... 20
Sketches showing the shapes of (A) vertical en-echelon series of intrusions which are joined at depth (Fossen, 2010)
and; (B) a more shallowly dipping series of veins exposed and surface, with blind intrusions at depth...................... 23
Idealised schematic model in profile showing the regional zonation in a pegmatite field around a cogenetic parental
granite intrusion ........................................................................................................................................................... 24
Schematic cross-section of the internal structure of zoned pegmatites ...................................................................... 25
Plot of selected global hard-rock lithium deposits (bubble size relative to contained Li2O) ........................................ 27
CSA Global Report Nº R133.2023
178
Chariot Corporation Ltd. | PROSPECTUS
V
CHARIOT CORPORATION LTD
INDEPENDENT TECHNICAL ASSESSMENT REPORT
Figure 4-5:
Figure 5-1:
Figure 5-2:
Figure 5-3:
Figure 5-4:
Figure 5-5:
Figure 5-6:
Figure 5-7:
Figure 5-8:
Figure 5-9:
Figure 5-10:
Figure 5-11:
Figure 5-12:
Figure 5-13:
Figure 5-14:
Figure 5-15:
Figure 5-16:
Figure 5-17:
Figure 5-18:
Figure 5-19:
Figure 5-20:
Figure 5-21:
Figure 5-22:
Figure 5-23:
Figure 5-24:
Figure 5-25:
Figure 5-26:
Figure 5-27:
Figure 5-28:
Figure 5-29:
Figure 5-30:
Figure 5-31:
Figure 5-32:
Figure 5-33:
Figure 5-34:
Figure 5-35:
Figure 5-36:
Figure 5-37:
Figure 5-38:
Figure 5-39:
Figure 5-40:
Figure 5-41:
Figure 5-42:
Figure 5-43:
Figure 5-44:
Figure 6-1:
Figure 6-2:
Spodumene-quartz intergrowth seen in thin section ................................................................................................... 28
Location of the Chariot lithium projects in central Wyoming, USA .............................................................................. 29
Black Mountain Project access map, Chariot claims in blue (UTM Zone 13 N NAD27) ................................................ 30
Copper Mountain Project (blue) with access tracks (red) over satellite image (UTM Zone 13N NAD27) .................... 31
Tin Cup and Jeffrey City (JC) claims (blue), location and access (UTM Zone 13N NAD27) ........................................... 32
South Pass claims (blue), location and access (UTM Zone 13N NAD27)....................................................................... 33
Location map for Pathfinder Project with access roads (UTM Zone 13N NAD27) ........................................................ 34
Average temperatures and precipitation for the town of Riverton ............................................................................. 35
Weather statistics by month for the town of Riverton................................................................................................. 35
Generalised sketch map of the Wyoming Geological Province .................................................................................... 36
Geological setting of Chariot projects in Wyoming ...................................................................................................... 37
Major geological domains and geological cross section of Wyoming (Black Mountain is labelled near the centre of
the State) ...................................................................................................................................................................... 38
Map of Eocene volcanic rocks for the Rattlesnake Hills area (Chariot’s Black Mountain and Black Mountain South
claim groups in blue; NAD27, UTM Zone 13 N) ............................................................................................................ 39
Geological setting of the Black Mountain and neighbouring Chariot projects ............................................................. 39
Geological map for the Black Mountain claim block (UTM Zone 13N NAD 27) updated to show the mapped and
interpreted pegmatites. ............................................................................................................................................... 40
Location of the Black Mountain Spodumene Pegmatites (Bing Satellite image background; NAD29 UTM Zone 13N) 41
Geological map for Copper Mountain Project .............................................................................................................. 42
Coarsely crystalline quartz-microcline core-zone to the Whippet pegmatites at Copper Mountain ........................... 43
Tin Cup Mountain, 100,000 geological map with Chariot claims (NAD 27, UTM Zone 13 N) ....................................... 44
Tin Cup Mountain Project, claims, geology and pegmatites interpreted from satellite imagery (NAD 27 UTM Zone
13N) .............................................................................................................................................................................. 45
South Pass – pegmatite distribution interpreted by Chariot using satellite imagery ................................................... 46
Pegmatite outcrop in the South Pass Project area ....................................................................................................... 46
JC Project, 100,000 geological map with Chariot claims (NAD 27, UTM Zone 13N) ..................................................... 47
Barlow Gap Project, 100,000 geological map with Chariot claims (NAD 27, UTM Zone 13N) ...................................... 48
Pathfinder Project, 100,000 geological map with Chariot claims (NAD 27, UTM Zone 13N) ....................................... 48
Locations of pegmatites described in Hanley et al. (1950) ........................................................................................... 49
Google Earth image for Black Mountain claim block with old costeans or trial pits (costeans or trial pits are evident
as linear, light colour anomalies – indicated with blue arrows) ................................................................................... 50
Black Mountain Project comprising Black Mountain and Black Mountain South pegmatite targets over local
geological map (UTM Zone 13N, NAD 27) .................................................................................................................... 53
Reconnaissance rock sample localities (2022) and geological map. See Figure 5-14 for legend. ................................. 55
Reconnaissance rock sampling location map with lithium values (ppm) ..................................................................... 56
Location of orientation soil samples at Black Mountain, with rock chip localities ....................................................... 56
Chariot geologist at a prospect pit on Black Mountain ................................................................................................ 57
Typical pegmatite outcrop on Black Mountain ............................................................................................................ 57
Pegmatite outcrop at Black Mountain; 20 cm long spodumene crystal from the same outcrop ................................. 58
Map showing the Black Mountain ground magnetics survey completed to date. ....................................................... 59
Copper Mountain Project - pegmatite targets, interpreted from satellite images ...................................................... 60
Map of part of Copper Mountain Project area showing pegmatite and mineral occurrence localities ....................... 61
Tin Cup Mountain Project claim location map ............................................................................................................. 62
Left – Tin Cup Mountain looking west; pegmatites dyke outcrops are white linear features; Right – Typical pegmatite
dyke outcrop at Tin Mountain (right) ........................................................................................................................... 62
South Pass Project claim location map, pegmatites interpretation from satellite images ........................................... 63
Thin linear pale-coloured outcrops of a pegmatite dyke swarm at South Pass............................................................ 63
JC Project claim location map ....................................................................................................................................... 64
Outcropping pegmatite dykes occurring within the JC claims ...................................................................................... 64
Barlow Gap Project claim location map with interrupted pegmatite distribution ....................................................... 65
Pathfinder Project claim location map ......................................................................................................................... 66
Location of the Nyamukono Project in Mashonaland East Province, Zimbabwe ......................................................... 67
Zimbabwe Craton showing the various pegmatite belts hosting LCT pegmatites in relation to the Archaean
greenstone belts ..............................................................................................................................................
Share your feedback
Discover